Pics of the new house

February 15, 2002 Framing for the Foundation
Feburary 26, 2002 The plumbers come
March 1, 2002 Measuring the backyard (which is mostly forest)
March 5, 2002 Prepping for the pouring of the foundation (tomorrow!!) and the roof trusses arrive
March 8, 2002 Foundation is poured and some of the blocks arrive
March 15-16, 2002 Block Construction begins
March 28, 2002 Framing begins
March 29,2002 Framing Continues, roof built on side of house
March 30,2002 Crane lifts roof on top of house
April 16, 2002 Framing is finished, plumbing, HVAC and wiring work. Roof felt installed
May 5, 2002 Shingles installed, finishing touches on electircal, HVAC and plumbing. Insulation installed. Ready for drywall.
May 6, 2002 Drywall arrives
May 8, 2002 Workers start hanging the drywall
May 10, 2002 Drywall is done, and workers start to tape the joints
May 17, 2002 "Texturing" applied to walls
May 20, 2002 Molding Installed
May 22, 2002 Insided painted our "custom" ($$) color, and a view of the cul-de-sac
May 27, 2002 House is painted on outside and the tile is installed
June 1, 2002 Garage door, mitered glass and shelving installed
June 7, 2002 After some heavy rains, there seems to be some substantial erosion
June 8, 2002 Master bath coming along, driveway poured, water stains in bonus room from broken window, and "unknown" hole in ceiling
June 11, 2002 Cabinets installed - Spice Cherry in kitchen, Bordeaux Cherry in Master Bath and Natural Maple in hall and pool baths
June 12, 2002 Bird with a fish in a tree above our house. Should have had the tele lens!!!!
June 21, 2002 Suppose to close a week from now?!?!?! Kitchen coming together, wiring and lighting finished, central vac
June 25-26, 2002 Lots of stuff going on. Finishing up the house, landscaping, sod installed, and huge crack on lanai. Lots of pics.
July 1, 2002 House is very near completed, except for the drainage/run-off issues
July 2, 2002 Screening installed on lanai, some of the grass ends up in the creek from run-off
July 3, 2002 Pulling up the sod to install matting on the back and to re-grade the soil from all of the run-off
August 9, 2002 Building the retainig wall
August 17, 2002 Finished the wall and re-graded and re-installed sod
August 20, 2002
Installed the gutter system that takes the water under-ground into the
creek